September 2, 1996

The GP7176 Engine for the Boeing 747-500X/-600X

FARNBOROUGH – The newly formed GE-P&W Engine Alliance today revealed the preliminary design details of the first member of its GP7000 family of engines, the GP7176. This engine will be developed for the proposed Boeing 747-500X/-600X series and other super-wide-body aircraft. Both companies believe that a derivative engine will not fully meet the fuel burn, operating economies, noise and payload/range requirements of the Boeing 747 Growth aircraft. By combining the expertise derived from placing in airline service 30,000 engines that have flown 1.2 billion hours, the alliance can deliver an engine to meet the requirements of Boeing and the world’s airlines for performance and operating economies decidedly better than the engines that power the current 747-400 series. The GP7000 engine family’s thrust range will be from 70,000 to 85,000 pounds (311 to 355.5 kN). The GP7176 will be rated at 76,000 pounds (338 kN) takeoff thrust. Pratt & Whitney is assuming responsibility for the fan, low pressure compressor, and low pressure turbine. GE will manage the high pressure compressor, combustor, and high pressure turbine. Each team will be responsible for its section’s design, development, certification, manufacture and service support. Pratt & Whitney will have final assembly and test responsibility. The GP7000 series is a completely new engine, but it builds directly on the well-established world-class technologies that GE and Pratt & Whitney bring to the program, including:

  • Lightweight, titanium, hollow, shroudless fan blades
  • High efficiency, three-dimensional compressor and turbine aerodynamics
  • Low emissions double annular combustor
  • High pressure ratio compressor technology
  • Advanced environmental and thermal coatings
  • State-of-the-art electronic controls

Application of these proven, advanced technologies will ensure an engine of unsurpassed reliability and lower operating costs that will be delivered on schedule. The alliance will create a comprehensive package of support services, using the extensive GE and P&W networks to minimize airline investment and maintenance costs. The alliance will offer long-term service agreements for both on- and off-wing maintenance, including spare engine support and full engine diagnostics. Engine configuration will be completed by the end of this year, with detail design and initial procurement beginning immediately. The first full engine will be run in mid-1998 with certification targeted for the end of 1999. Plans call for flight testing and engine/aircraft certification to be completed in 2000, with potential entry into service in December of that year.